Wheatstone's preparations for NAB are always quite fascinating, both to watch and to be a part of. In the course of just a few weeks, new products have their finishing touches applied, the booth is planned, mocked up, and dressed out, furniture and display setups are polished, painted, and shined, and crates are loaded. The culmination of that effort, at least for the factory crew, is the loading of the semitrailer that will haul it all to Las Vegas.
The photos below document this year's load-out. As you can see, there's a lot of gear and freight to move, but our crew has this down to a science, and carefully packs it all in for the trip. These photos are courtesy of Denny Murdock, our VP Operations.
{gallery}NAB2013_Truck{/gallery}